Manton Forest Farm Windmill Lane Worksop Nottinghamshire S80 3AX
3rd April 2024
Proposed Agricultural Steel Framed Building for the Storage of Hay/Straw
Manton Forest Farm Windmill Lane Worksop Nottinghamshire S80 3AX
17th January 2024
Erect a Steel Portal Framed Building for Housing of Livestock (Pigs)
Garden House Clumber Lane Clumber Park Nottinghamshire S80 3AY
12th October 2023
Change of Use from Old Tea Room to Holiday Cottage and Installation of External Air Source Heat Pump. External Works to Garden and Boundary Treatments with Local Car Parking Spaces.
Clumber Park Pleasure Grounds Clumber Park Nottinghamshire S80 3BE
21st September 2023
Proposed Resurfacing of Existing Path Network, Reinstatement of Historic Pathways With New Surfacing and Introducing Metal Edging to Paths
Clumber Park Pleasure Grounds Clumber Park Nottinghamshire S80 3BE
19th September 2023
Proposed Resurfacing of Existing Path Network, Reinstatement of Historic Pathways With New Surfacing and Introducing Metal Edging to Paths
Clumber Cottage And Little Cottage Clumber Lane Clumber Park Worksop Nottinghamshire S80 3BQ
4th September 2023
Installation of Oil Heating System Including Two Flues to External Wall, Siting of 3500 Litre Oil Tank, Close Boarded Timber Fencing and Associated Pipework
Land Off Lime Tree Avenue Clumber Park Nottinghamshire S80 3AE
3rd May 2023
Proposed Installation a New Telecommunications Base Stations Comprising of 25m Lightweight Lattice Telecommunications Tower with 3no. Radio Antennas, 3no. Transmission Dishes, Radio Equipment Housing, Powersafe Generator Container, along with Ancillary Dev
Manton Forest Farm Windmill Lane Worksop Nottinghamshire S80 3AX
30th January 2023
Proposed Agricultural Workers Dwelling
DHL Manton Wood Worksop S80 3AX
3rd May 2022
Hazardous Substances Consent for the Increase in Storage of Various Hazardous Substances
19 Hardwick Terrace Clumber Park Worksop Nottinghamshire S80 3PD
18th February 2022
Taking Down and Re-Building of North West Chimney Stack, Emergency Works Required as Structural Concerns Noted During Routine Repair Works.
23 Hardwick Terrace Clumber Park Worksop Nottinghamshire S80 3PD
18th August 2021
The Decommissioning of the Existing Solid Fuel Back Boiler from the Lounge and Removal of Existing Central Heating Radiators Throughout the House. The Installation of a Externally Mounted Wall Hung Oil Fired Boiler Positioned on the Gable End Wall. Install
23 Hardwick Terrace Clumber Park Worksop Nottinghamshire S80 3PD
18th August 2021
Installation of a Externally Mounted Wall Hung Oil Fired Boiler Positioned on the Gable End Wall and Installation of a 1800l Oil Tank and Concrete Base
DHL Manton Wood Worksop S80 3AX
12th August 2021
Hazardous Substances Consent for the Increase in Storage of Various Hazardous Substances
Caravan Club Lime Tree Avenue Clumber Park Worksop Nottinghamshire S80 3BE
14th July 2021
Site Redevelopment at Clumber Park including the Demolition and Rebuilding of Two Toilet Blocks, Additional All-Weather, Serviced and Premium Pitches, a New Play Area, New Site Manager Accommodation Unit and Various Sitewide Works
DHL Manton Wood Worksop S80 3AX
31st March 2021
Hazardous Substances Consent for the Increase in Storage of Various Hazardous Substances
Clumber Park Lodges Clumber Lane Clumber Park Worksop Nottinghamshire S80 3BQ
24th March 2021
Outline Application With All Matters Reserved for the Siting of 50 Additional Holiday Lodges
29 Hardwick Terrace Clumber Park Worksop Nottinghamshire S80 3PD
3rd February 2021
Install a Replacement Oil Fired Central Heating Boiler in the Utility Room with a Flue to the Exterior
Clumber Lane End Farm Clumber Lane Clumber Park Worksop Nottinghamshire S80 3BQ